Sélectionnez la devise
Devise fiat
Crypto-monnaies
Aucun résultat pour ""
Nous n'avons rien trouvé qui corresponde à votre recherche. Réessayez avec d'autres mots-clés.
Optimism(OP) Fjord upgrade
Listing
The Fjord upgrade for OP Sepolia was activated on 1716998400 Wed May 29 16:00:00 UTC 2024. The Fjord OP Mainnet upgrade will be optimistically activated 1720627201 Thu July 10 16:00:01 UTC 2024.
What's Included in Fjord
The Fjord network upgrade(opens in a new tab) includes the following:
- RIP-7212(opens in a new tab): Precompile for secp256r1 Curve Support, to reduce gas costs of many smart wallet applications.
- Brotli(opens in a new tab) as a channel compression option, for ~5-15% lower data availability costs.
- Parameter changes: Max sequencer drift(opens in a new tab) becomes a constant with value increased to 1800 seconds.10x increased values for
MAX_RLP_BYTES_PER_CHANNEL
andMAX_CHANNEL_BANK_SIZE
- The Fjord hardfork activation block(opens in a new tab) includes several transactions to perform all L2 contract deployments, upgrades, enablements, and proxy updates.
- L1 Gas Cost changes: 1. FastLZ(opens in a new tab) based L1 fee cost calculation(opens in a new tab) with an upgraded
GasPriceOracle
L2 predeploy(opens in a new tab) to compute it 2.GasPriceOracle
gets a new functiongetL1FeeUpperBound
as a cheap new way to calculate an upper bound for the max fee of a new transaction3.getL1GasUsed
method of theGasPriceOracle
contract (spec(opens in a new tab)) is being deprecated4.L1GasUsed
field of the transaction receipt (spec(opens in a new tab)) is being deprecated
Retrouvez-nous sur:
X (Twitter) | Telegram | Reddit
Télécharger l'application CoinCarp maintenant: https://www.coincarp.com/app/
Approbation:87% Votes:92
Événements similaires Autres événements à venir Autres événements passés