Mata Wang Fiat
Mata Wang Crypto
Tiada hasil untuk ""
Kami tidak dapat mencari apa-apa yang sepadan dengan carian anda. Cuba lagi dengan istilah yang berbeza.
THORChain(RUNE) Hard Fork Upgrade
September-2024 Hard Fork Preparation
THORChain's blockchain will undergo an upgrade on 4 September 2024 at 4pm UTC, estimated at block 17561740 No action is required by any user Exchanges, wallets, and dApps must prepare to ensure a seamless transition for your users.
What is being upgraded during the hard fork?
- Cosmos SDK version upgrade from 45.1 to 45.16
- Remove obsolete legacy code
- Remove unnecessary Cosmos modules
- Trim node state for faster sync (>1 TB)
- Add support for Bitcoin Taproot addresses
This is a routine upgrade/planned maintenance that must be performed in a hard fork, rather than the usual chain upgrade path. Again, no action is required by any user Interfaces must prepare to ensure the proper support of the new Chain ID
Ikuti Media Sosial CoinCarp dan Berbincang dengan Kami:
X (Twitter) | Telegram | Reddit
Muat Turun Aplikasi CoinCarp Sekarang: https://www.coincarp.com/app/
-
Observable Network Data
Make Network Data More Observable | Ecosystem Data & Tooling
Semua AcaraPersetujuan: 90%
-
Momentum Fund
Flight school is coming to an end next month, making way for the Momentum Fund.
Semua AcaraPersetujuan: 95%
-
Network Upgrade
The BSV(Bitcoin SV) Network Upgrade will take place at block height of 943816 approximately at 12:00:00 (UTC) on April 7, 2026.
Semua AcaraPersetujuan: 89% -
Network Upgrade
The KAIA(KAIA) Network Upgrade will take place at block height of 213333000 (approximately at 01:03:00 (UTC) on April 7, 2026.
Semua AcaraPersetujuan: 94%