Selecteer Valuta
Fiat-valuta's
Cryptovaluta's
Geen resultaten voor ""
We konden niets vinden dat overeenkomt met uw zoekopdracht. Probeer het opnieuw met een andere term.
Optimism(OP) Fjord upgrade
Release
The Fjord upgrade for OP Sepolia was activated on 1716998400 Wed May 29 16:00:00 UTC 2024. The Fjord OP Mainnet upgrade will be optimistically activated 1720627201 Thu July 10 16:00:01 UTC 2024.
What's Included in Fjord
The Fjord network upgrade(opens in a new tab) includes the following:
- RIP-7212(opens in a new tab): Precompile for secp256r1 Curve Support, to reduce gas costs of many smart wallet applications.
- Brotli(opens in a new tab) as a channel compression option, for ~5-15% lower data availability costs.
- Parameter changes: Max sequencer drift(opens in a new tab) becomes a constant with value increased to 1800 seconds.10x increased values for
MAX_RLP_BYTES_PER_CHANNEL
andMAX_CHANNEL_BANK_SIZE
- The Fjord hardfork activation block(opens in a new tab) includes several transactions to perform all L2 contract deployments, upgrades, enablements, and proxy updates.
- L1 Gas Cost changes: 1. FastLZ(opens in a new tab) based L1 fee cost calculation(opens in a new tab) with an upgraded
GasPriceOracle
L2 predeploy(opens in a new tab) to compute it 2.GasPriceOracle
gets a new functiongetL1FeeUpperBound
as a cheap new way to calculate an upper bound for the max fee of a new transaction3.getL1GasUsed
method of theGasPriceOracle
contract (spec(opens in a new tab)) is being deprecated4.L1GasUsed
field of the transaction receipt (spec(opens in a new tab)) is being deprecated
Blijf op de hoogte van CoinCarp Social Media en discussieer met ons:
X (Twitter) | Telegram | Reddit
Download nu de CoinCarp-app: https://www.coincarp.com/app/
Goedkeuring:87% Stemmen:92
Vergelijkbare Evenementen Andere Aankomende Evenementen Andere Verleden Evenementen